麻豆极品jk丝袜自慰喷水久久_艳妇乳肉豪妇荡乳AV_久久久久国产精品_欧美性猛交XXXX乱大交蜜桃

Welcome to the official website of Hebei Chaoda sealing products Co., Ltd!
河北超達密封制品股份有限公司
news information
information
news information INDEX > news information > Industry News > Construction requirements for polyurethane waterproof coating

Construction requirements for polyurethane waterproof coating

Time:2023.04.27     News sources: Hebei Chaoda Sealing Products Co., Ltd

1. The base surface is required to be flat, clean, free from sand and looseness, and with a moisture content of less than 8%.

2. During construction, the base surface acceptance should be carried out first to ensure compliance with the requirements. A layer of primer must be applied first, and the primer must be uniform.

3. After the adhesive has solidified, proceed with a second application, with the direction of the application perpendicular to the previous one to prevent missed scratches. Apply three to five times in sequence.

4. After completion, no personnel are allowed to enter or proceed to the next process before the waterproof layer has solidified, in order to avoid damaging the waterproof layer.

≡  CONTACTS:Manager Wu ≡  TELEPHONE:0319-4368088 0319-4333899 ≡  FAX:0319-4368269 0319-4333899 ≡  MOBILE機:13932919068 ≡  ADDRESS:West Julu and Technological Development Zone
河北超達密封
Copyright: Hebei Chaoda sealing products Co., Ltd      technical support:邢臺市網商軟件開發有限公司
網站備案/許可證號:

Official wechat

河北超達密封

Mobile website